Domestically-funded enterprise in Hongkong& Mainland Shenzhen China
There are about 1200 sq.m for our workshop.
There are more than 80 employees in our factory.
Our production lines are including precision CNC machining, CNC Turning, Auto-Lathe Turning, CNC Lathing, Milling, Drilling(gun drilling),Grinding(internal and cylindrical ), Polishing, Engraving, Texturing ; Precision Inspection Fixtures& Jigs. Metal Plating (electroplating);
Titanium Alloy:Ti-6AI-4V;TA1/TA2/TC4, Gr1TA1;6Al-2Sn-4Zr-6Mo; N02200;
Steel: Such as P20, 718, 8407, NAK80, H13, S136, DIN 1.2738, DIN 1.2344, SUM24EZC、SUM24EZX、SUM24L、C12L14、C12L15、SUM23, Fe00, Q235, 40Cr, 20CrNiMo, 35CrMn, 65Mn, of GCr15, SDK11
Stainless Steel:SUS303、SUS304、SUS316、SUS416F , 304, 304 L, 316, 410, 416, 420 F, 430F, 440C, 630 and 17 – 4PH.b
Copper:C3602、C3604, H59Pb – 1, H62, C34000, C36000 and tin bronze.e
Aluminum Alloy: 6061、2011,: 2024, 5052, 6061, 6063, 6082, and 7075.c.
Engineering plastics: ABS, PBT, POM, PTFE- , PPS, PEI, PEEK, PA66, PP, PETP, DELR…
Yes, We can provide steel certificate or heat treatment certificate for every export tooling.
Yes, we have long-term cooperated subsidiary suppliers that do those processes..
We aim to quote all prototype projects within 24 hours. All rapid tooling projects within 24 hours. All injection molding, production and export tooling within 3 days. There are sometimes processes and materials which GPT does not offer in house; these could add time to the quotation and will be highlighted as and when.
It all depends on the part size and complexity. Normally, the lead time is 7—15days.
Yes, we have a special agent in Hong Kong, they will handle all shipping (Air, Sea and Express) for us, it is much cheaper than shipping direct from Shenzhen. We also accept FOB Shenzhen if needed.